Total Integrated Solutions will service your UPS System by following the steps below to ensure that battery life is maximised.
Maintenance Steps
- Voltage and Current Rating will be checked to confirm with original design and data sheets.
 - Check the Location and Orientation of UPS to design and drawing.
 - A visual inspection will be carried out for damaged or missing part (conducting visual inspections for wear and deterioration of battery and insulation components).
 - Check that the equipment installed is as per specification and drawings.
 - Check all cable sizes and numbering.
 - Check panels are labelled and installed as per design.
 - Check batteries and chargers.
 - Visual check of damage to batteries and chargers.
 - Verify and record correct inter. Battery connections and size.
 - Performance test – complete test certificate.
 - Check glanding, lugging and terminal numbers are correct.
 - Check earthing.
 - Any deviations or changes to be recorded on the As Built and documented.
 - Test any other electrical system components, such as transfer switches, circuit breakers and maintenance bypasses.
 - Clean and vacuum the enclosure.
 - Monitor the enclosures temperature and check humidity, please document your readings.
 - Test Battery Voltage
 - Test Run w or w/c load
 - Simulate and record findings of a power cut.
 - Record any comments.